Germany is first to publish a NAP timeline: what it means for the rest of the EU

We track National Access Point (NAP) readiness across the EU (see our NAP readiness tracker), and most countries are still speaking in generalities: "we are preparing," "work is under way." Germany's Kraftfahrt-Bundesamt (KBA) has now given IVI participants firm dates and operating rules for its own version 2.0 NAP. It is the first time the eCoC mechanism from Regulation (EU) 2018/858 has been described in operational terms: what switches off, what switches on, and in what order. This is Germany's own EU scheme, distinct from the UK's VCA system, but the mechanics below apply wherever you submit into an EU national access point.
Why Germany is the best test case for the rest of the EU
Germany built its own National Access Point rather than waiting for the shared EUCARIS build, which let it publish a firm plan earlier than other member states. Its timeline is currently the best available indicator of how the rules in Regulation (EU) 2018/858 will actually be applied elsewhere, even though the specific national dates will differ.
Three mechanisms in Germany's timeline that will reach every market
EUCARIS forwarding
From 5 November 2026, German registration authorities can query IVI-CoC 2.0 records, and the EUCARIS network begins forwarding those same records to other member states. That is the same cross-border mechanism meant to handle a vehicle bought in one EU country and registered in another.
The end of deletion, the start of corrections
Records reach other countries via EUCARIS before they are even stored locally, which is why KBA will no longer be able to delete them from version 2.x onwards. The only way to fix a mistake is a separate correction record. It is hard to imagine other NAPs carving out an exception to the same data architecture.
A forced submission order
National data may only be sent after the IVI-CoC record has been transmitted, and KBA recommends allowing a full day. This is a sequencing requirement, not a parallel one, so systems built to send both datasets together will need fixing regardless of the target country.
What this means if you sell into several EU markets at once
- Do not design your eCoC process around a single market. The mechanisms KBA has revealed come from the regulation itself, not from anything German-specific, so they will surface wherever a NAP is still being built.
- Check your signing certificate against the EU's DSS tool now, whichever market you sell into first.
- Build a fixed gap between sending the eCoC and sending national data into your process, so the same logic works in every market without manual exceptions.
- Treat every mistake as a candidate for correction rather than deletion and resubmission, before your local NAP forces the point.
One logic, every EU market
CoCDesk uses one submission, sequencing and correction logic regardless of whether a document goes to the NAP in Germany, Poland or any other EU country, so a company selling into several markets does not need separate logic for each one.
Source: Kraftfahrt-Bundesamt (KBA), Abteilung Typgenehmigung, notice to IVI process participants, September 2026.